AutoParts Store
Shopper Approved - 4.8 StarsTrust Guard Secure
SHOP
PRODUCTSBRANDSPARTS REQUESTDEALERS
SUPPORT
CONTACTORDER STATUSFAQSHIPPING POLICYRETURN POLICYPRIVACY POLICY
COMPANY
ABOUT USNEWSGALLERYREADERS RIDESRR TERMS OF USESITE MAP

Copyright © 2026 KT Performance. All Rights Reserved. Powered by  Web Shop Manager.

kt-performance
kt-performance

Brands

Parts Request

Dealers

About

Contact

1-855-587-3736

MY CART

YOUR CART IS EMPTY

Browse parts and accessories to get started.

Brands
Parts Request
Dealers
About
Contact
HOME / PRODUCT / Industrial Injection AE Reman Long Lead Injector for Ford/Nav (1999.5-02) 7.3L Power Stroke, Stock (#8 Long Lead)
SaleIndustrial Injection AE Reman Long Lead Injector for Ford/Nav (1999.5-02) 7.3L Power Stroke, Stock (#8 Long Lead)

Industrial Injection AE Reman Long Lead Injector for Ford/Nav (1999.5-02) 7.3L Power Stroke, Stock (#8 Long Lead)

SKU: GHJVAEPS
Industrial Injection AE Reman Long Lead Injector for Ford/Nav 7.3L Power Stroke, Stock (#8 Long Lead)
$158.99$190.99
Loading options…

Description

Industrial Injection 7.3L AE Power Stroke Reman Stock Exchange Injector

Our Ford 7.3L re-manufactured injectors are built with all new internal fuel plungers, nozzles/nozzle springs and OE internal and external O-ring kits. Each oil valve is re-manufactured to OE specs and measures at .004" armature clearance (We do not shim our oil valves). After the precision assembly process, each injector is calibrated on our state of the art Hartridge HA230 injector calibrator to insure a true 4cc cylinder to cylinder fuel delivery.

Fitment Notes: 1999-2003 Ford F-Series, E-Series (Built after 12/07/98)

-Stock Replacement Injector for 1999-2003 Ford F-Series, E-Series (Built after 12/07/98) Diesels.

Tell a Friend

Your Name:
Product:Industrial Injection AE Reman Long Lead Injector for Ford/Nav (1999.5-02) 7.3L Power Stroke, Stock (#8 Long Lead)

200 characters remaining